Factors Affecting the Performance of Construction Project under Oromia Industry and Urban Development Bureau, Ethiopia

Authors

  • Abera Legesse Yada Addis Ababa University, Ethiopia
  • Fekadu Takele Yadeta Addis Ababa University, Ethiopia

DOI:

https://doi.org/10.18034/ra.v4i2.303

Keywords:

building, construction, urban development, Ethiopia

Abstract

In Oromia the number of building construction projects is increasing from time to time. However, it becomes difficult to complete projects in the allocated cost, time and quality. Taking this into consideration, cost, time, and quality and leadership performance problem is one of the major problems in Oromia industry and urban development Bureau building construction projects. Therefore, this research was carried out to investigate factors that affect cost, time, and quality and leadership style performance during construction projects under Oromia industry and urban development Bureau. Questionnaire surveys together with desk study were used to collect data on time and cost overrun. A total of 30 questionnaires from owner, consultants and contractors were collected and a desk study of 10 completed building construction projects in Oromia industry and urban development were investigated. From the results it was found that 100% of the building construction projects suffered both time and cost performance. The actual rate of cost performance ranges from a minimum of 12% to the maximum of 60% of the contract amount and the actual time performance ranges from a minimum of 7% to the maximum of 170% of the contract time. Respondents identified 13 factors affecting cost performance, 31 factors affecting time performance, 5 factors affecting quality performance and 3 factors affecting leadership performance for under Oromia industry and urban development Bureau building construction projects case. The extremely significant factors of affecting time performance were delay to furnish and deliver the site (Right of way problem), financial problems and improper planning. Whereas the extremely significant factors affecting cost performance were design changes, fluctuations in the cost of most significant factors affecting quality performance were construction project educated personnel, relevant work experienced personnel, quality of materials and equipment used in the project construction and conformance to specification. The most significant factors affecting the leadership performance were leader’s professional education, leader’s relevant work experience and training.

Downloads

Download data is not yet available.

References

See the Manuscript

Downloads

Published

31-08-2016

Issue

Section

Thesis Paper

How to Cite

Yada, A. L., & Yadeta, F. T. (2016). Factors Affecting the Performance of Construction Project under Oromia Industry and Urban Development Bureau, Ethiopia. ABC Research Alert, 4(2), Ethiopia. https://doi.org/10.18034/ra.v4i2.303

Similar Articles

21-30 of 54

You may also start an advanced similarity search for this article.