Factors Affecting the Performance of Construction Project under Oromia Industry and Urban Development Bureau, Ethiopia
DOI:
https://doi.org/10.18034/ra.v4i2.303Keywords:
building, construction, urban development, EthiopiaAbstract
In Oromia the number of building construction projects is increasing from time to time. However, it becomes difficult to complete projects in the allocated cost, time and quality. Taking this into consideration, cost, time, and quality and leadership performance problem is one of the major problems in Oromia industry and urban development Bureau building construction projects. Therefore, this research was carried out to investigate factors that affect cost, time, and quality and leadership style performance during construction projects under Oromia industry and urban development Bureau. Questionnaire surveys together with desk study were used to collect data on time and cost overrun. A total of 30 questionnaires from owner, consultants and contractors were collected and a desk study of 10 completed building construction projects in Oromia industry and urban development were investigated. From the results it was found that 100% of the building construction projects suffered both time and cost performance. The actual rate of cost performance ranges from a minimum of 12% to the maximum of 60% of the contract amount and the actual time performance ranges from a minimum of 7% to the maximum of 170% of the contract time. Respondents identified 13 factors affecting cost performance, 31 factors affecting time performance, 5 factors affecting quality performance and 3 factors affecting leadership performance for under Oromia industry and urban development Bureau building construction projects case. The extremely significant factors of affecting time performance were delay to furnish and deliver the site (Right of way problem), financial problems and improper planning. Whereas the extremely significant factors affecting cost performance were design changes, fluctuations in the cost of most significant factors affecting quality performance were construction project educated personnel, relevant work experienced personnel, quality of materials and equipment used in the project construction and conformance to specification. The most significant factors affecting the leadership performance were leader’s professional education, leader’s relevant work experience and training.
Downloads
References
See the Manuscript
Downloads
Published
Issue
Section
License
ABC Research Alert is an Open Access journal. Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal the right of first publication with the work simultaneously licensed under a CC BY-NC 4.0 International License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of their work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in this journal. We require authors to inform us of any instances of re-publication.